Tavells Lane Solar Farm

Operator Hive Energy

Operational5.3 MWData checked 16 November 2026Source record dated 12 April 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tavells Lane Solar Farm is a 5.3 MW solar farm in Marchwood, Hampshire, United Kingdom. Its planning application (12/98402) went to New Forest on 12 March 2012 and was granted on 8 May 2012. It has been operating since 20 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 54 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 27 other sites and 364 energy sites within 40 km for Tavells Lane Solar Farm

Members see the sites and incidents around this one, and every record behind them.

HIVE ENERGY ASIA LIMITED (11668649), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Hive Energy
Location
Tavells Lane, Marchwood, Southampton, Hampshire, SO40 4WH, United Kingdom
Planning authority
New Forest
Planning application
12/98402
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/98402, with what the planning evidence pack adds for this site.

Every application in New Forest · Alerts for applications and incidents near here

  • 12 March 2012 Planning application submitted
  • 8 May 2012 Planning permission granted
  • 4 February 2013 Construction started
  • 20 March 2013 Operational

None found. The register holds no published incident that names Tavells Lane Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Tavells Lane Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tavells Lane Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Tavells Lane Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 April 2013.
Where is Tavells Lane Solar Farm?
In Marchwood, Hampshire, United Kingdom (postcode SO40 4WH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).