← Back to Hampshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Slowhill Copse, Bury Road - Battery Storage Facility

Operator Trant Engineering Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 12 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Slowhill Copse, Bury Road - Battery Storage Facility is a battery storage site in Marchwood, Hampshire, United Kingdom. Its planning application (24/11043) went to New Forest on 5 December 2024 and was granted on 22 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 53 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Slowhill Copse, Bury Road - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 96 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire96 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter142 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction146 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Trant Engineering Limited
Location
Slowhill Copse, Bury Road, Marchwood, Southampton, Hampshire, SO40 4UD, United Kingdom
Planning authority
New Forest
Planning application
24/11043

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/11043, with what the planning evidence pack adds for this site.

Every application in New Forest · Alerts for applications and incidents near here

  • 5 December 2024 Planning application submitted
  • 22 April 2025 Planning permission granted
  • 22 April 2028 Planning permission runs out

None found. The register holds no published incident that names Slowhill Copse, Bury Road - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Slowhill Copse, Bury Road - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Slowhill Copse, Bury Road - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Slowhill Copse, Bury Road - Battery Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
Where is Slowhill Copse, Bury Road - Battery Storage Facility?
In Marchwood, Hampshire, United Kingdom (postcode SO40 4UD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).