Planning pack for this site, £295Other options

Solar · Australia

Suntop

Under Construction150 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Suntop is a 150 MW solar farm 44 km south-east of Dubbo, New South Wales, Australia. Its status in the OpenElectricity facility data (Australia) is under construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 24 incidents at solar farms (hybrid battery and solar sites included) in Australia, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Suntop sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable solar incidents in Australia, nearest first. The nearest is EIR-0400, Solar farm fire near Dubbo prompts rescue chief to flag training gaps, 44 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04002025Solar farm fire near Dubbo prompts rescue chief to flag training gaps44 kmMinor
EIR-12682024Solar panels catch fire at Sydney Olympic Park aquatic centre262 kmMinor
EIR-20732020Rooftop solar DC isolator catches fire on a home in New Lambton, Newcastle269 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
150 MW
Capacity figure from
OpenElectricity facility data (Australia)
Status
Under Construction (Committed)
Location
New South Wales, 2820, Australia

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Suntop. If you know of one, report it (confidential reports are anonymised).

Has Suntop had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Suntop; it holds 24 incidents at solar farms (hybrid battery and solar sites included) in Australia.
What is the status of Suntop?
Under Construction, in the OpenElectricity facility data (Australia).
Where is Suntop?
44 km south-east of Dubbo, New South Wales, Australia (postcode 2820).

Source: OpenElectricity (formerly OpenNEM) facility data, licensed under CC BY 4.0. The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).