Battery storage · United Kingdom

Studley Farm - Solar Farm & Battery Storage

Operator Aura Power

Under ConstructionData checked 16 November 2026Source record dated 23 October 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Studley Farm - Solar Farm & Battery Storage is a battery storage site 3.2 km south of Neston, Wiltshire, United Kingdom. Its planning application (PL/2021/08690) went to Wiltshire on 30 September 2021 and was granted on 9 June 2022. Construction started on 1 September 2026. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 51 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AURA POWER LTD (08536503), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Studley Farm - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire41 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter115 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction181 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Under Construction
Operator or applicant
Aura Power
Location
Studley Farm, Atworth, Melksham, Wiltshire, SN12 8JN, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2021/08690

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2021/08690, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

Status changed from Awaiting Construction to Under Construction on 16 November 2026.

  • 30 September 2021 Planning application submitted
  • 9 June 2022 Planning permission granted
  • 1 September 2026 Construction started

None found. The register holds no published incident that names Studley Farm - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Studley Farm - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Studley Farm - Solar Farm & Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Studley Farm - Solar Farm & Battery Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Studley Farm - Solar Farm & Battery Storage?
3.2 km south of Neston, Wiltshire, United Kingdom (postcode SN12 8JN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).