Solar · United Kingdom

Kemble Wick

Operator Aura Power

Operational49.9 MWData checked 16 November 2026Source record dated 14 April 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kemble Wick is a 49.9 MW solar farm 7.7 km south-west of Cirencester, Gloucestershire, United Kingdom. Its planning application (PL/2021/06919) went to Cotswold on 27 July 2021 and was granted on 25 March 2022. It has been operating since 1 February 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 49 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 7 other sites and 466 energy sites within 40 km for Kemble Wick

Members see the sites and incidents around this one, and every record behind them.

AURA POWER LTD (08536503), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Aura Power
Location
Kemble Wick, Cirencester, Gloucestershire, GL7 6EH, United Kingdom
Planning authority
Cotswold
Planning application
PL/2021/06919
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2021/06919, with what the planning evidence pack adds for this site.

Every application in Cotswold · Alerts for applications and incidents near here

  • 27 July 2021 Planning application submitted
  • 25 March 2022 Planning permission granted
  • 1 February 2025 Construction started
  • 1 February 2026 Operational

None found. The register holds no published incident that names Kemble Wick. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kemble Wick had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kemble Wick; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kemble Wick?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 April 2026.
Where is Kemble Wick?
7.7 km south-west of Cirencester, Gloucestershire, United Kingdom (postcode GL7 6EH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).