Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility

Operator ADV 003 Limited · Owner Adv 004 Limited

Awaiting Construction150 MWData checked 16 November 2026Source record dated 8 July 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility is a 150 MW battery storage site on the edge of Melksham, Wiltshire, United Kingdom. Its planning application (PL/2022/03914) went to Wiltshire on 13 June 2022 and was granted on 6 January 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 56 other energy sites within 10 km, 16 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ADV 003 LIMITED (12316717), active, since 2019. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire41 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter116 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction180 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
150 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
ADV 003 Limited
Owner
Adv 004 Limited
Location
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, Wiltshire, SN12 8LW, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2022/03914

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2022/03914, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 13 June 2022 Planning application submitted
  • 6 January 2023 Planning permission granted
  • 6 January 2026 Planning permission expired

None found. The register holds no published incident that names Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2022.
Where is Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility?
On the edge of Melksham, Wiltshire, United Kingdom (postcode SN12 8LW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).