Battery storage · Germany

Stromspeicher Batterie Riegel II

Operator Brandstätter Solarpark GmbH & Co. KG

Operational8.1 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stromspeicher Batterie Riegel II is a 8.1 MW battery storage site on the edge of Neresheim, Germany. It first operated in 2025. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 26 other energy sites within 10 km. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

The operator's 5 other sites and 285 energy sites within 40 km for Stromspeicher Batterie Riegel II

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Usable capacity 14.2 MWh, Lithium-Batterie)
Capacity
8.1 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Operational (In operation)
Operator
Brandstätter Solarpark GmbH & Co. KG
Location
Neresheim, Ostalbkreis, Baden-Württemberg, 73450, Germany
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 1 August 2025 Operational

None found. The register holds no published incident that names Stromspeicher Batterie Riegel II. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stromspeicher Batterie Riegel II had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Stromspeicher Batterie Riegel II; it holds 17 incidents at battery storage sites in Germany.
What is the status of Stromspeicher Batterie Riegel II?
Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Stromspeicher Batterie Riegel II?
On the edge of Neresheim, Germany (postcode 73450).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).