Around this site

← Back to Aragón

Solar · Spain

Stellantis (Zaragoza) solar farm

Operational31.1 MWChecked 8 October 2026Last changed in the dataset 24 January 2023

Technology
Solar
Capacity
31.1 MW
Status
Operational (Operating)
Operator
Stellantis
Owner
Stellantis NV [100%]
Location
Ribera Alta del Ebro, Aragón, Spain
First operating
2022
Phases in the tracker
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Stellantis (Zaragoza) solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.