← Back to Bayern
Planning pack for this site, £295Other options

Battery storage · Germany

Speicher Taiting II

Operator Solarpark Taiting II GmbH & Co. KG

Planned2.2 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Speicher Taiting II is a 2.2 MW battery storage site on the edge of Dasing, Germany. It first operated in 2028. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 26 other energy sites within 10 km, 4 of them battery storage sites. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Speicher Taiting II sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-2478, Battery storage unit fire releases gases in Obernzell, Germany, 190 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-24782026Battery storage unit fire releases gases in Obernzell, Germany190 kmSignificant
EIR-15862024Third battery fire at Suncycle site in Thuringia279 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre279 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 4.4 MWh, Lithium-Batterie)
Capacity
2.2 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Solarpark Taiting II GmbH & Co. KG
Location
Dasing, Aichach-Friedberg, Bayern, 86453, Germany
First operating
2028

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Speicher Taiting II. If you know of one, report it (confidential reports are anonymised).

Has Speicher Taiting II had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Speicher Taiting II; it holds 17 incidents at battery storage sites in Germany.
What is the status of Speicher Taiting II?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Speicher Taiting II?
On the edge of Dasing, Germany (postcode 86453).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).