Battery storage · Germany
Speicher Nordost
Operator INNOWA GmbH
Planned1.4 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Speicher Nordost is a 1.4 MW battery storage site on the edge of Derne, Dortmund, Dortmund, Nordrhein-Westfalen, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 19 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.
Get an email when Speicher Nordost changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Speicher Nordost sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-1586, Third battery fire at Suncycle site in Thuringia, 254 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1586 | 2024 | Third battery fire at Suncycle site in Thuringia | 254 km | Significant |
| EIR-2437 | 2024 | Battery container fire causes EUR 700,000 damage at German test centre | 254 km | Significant |
| EIR-0097 | 2026 | Battery storage fire in Bautzen, Germany prompts local evacuations | 480 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Usable capacity 2.8 MWh, Lithium-Batterie)
- Capacity
- 1.4 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Planned (In planning)
- Operator
- INNOWA GmbH
- Location
- Dortmund, Dortmund, Nordrhein-Westfalen, 44329, Germany
- First operating
- 2027
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Speicher Nordost. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Speicher Nordost had a fire or other incident?
- None is on the register as of 10 November 2026. The register holds no published incident that names Speicher Nordost; it holds 17 incidents at battery storage sites in Germany.
- What is the status of Speicher Nordost?
- Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Speicher Nordost?
- On the edge of Derne, Dortmund, Dortmund, Nordrhein-Westfalen, Germany (postcode 44329).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).