Battery storage · Germany
Speicher Letschin 04/21
Operator LHI SolarWind PV Letschin 2683 GmbH & Co. KG
Operational4.6 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Speicher Letschin 04/21 is a 4.6 MW battery storage site 13 km north of Seelow, Gusow-Platkow, Märkisch-Oderland, Brandenburg, Germany. It first operated in 2023. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 30 other energy sites within 10 km, 3 of them battery storage sites. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.
Get an email when Speicher Letschin 04/21 changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in Germany. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Usable capacity 9.1 MWh, Lithium-Batterie)
- Capacity
- 4.6 MW
- Capacity figure from
- Marktstammdatenregister (Bundesnetzagentur, Germany)
- Status
- Operational (In operation)
- Operator
- LHI SolarWind PV Letschin 2683 GmbH & Co. KG
- Location
- Gusow-Platkow, Märkisch-Oderland, Brandenburg, 15324, Germany
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 3 November 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Speicher Letschin 04/21. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Speicher Letschin 04/21 had a fire or other incident?
- None is on the register as of 11 November 2026. The register holds no published incident that names Speicher Letschin 04/21; it holds 17 incidents at battery storage sites in Germany.
- What is the status of Speicher Letschin 04/21?
- Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
- Where is Speicher Letschin 04/21?
- 13 km north of Seelow, Gusow-Platkow, Märkisch-Oderland, Brandenburg, Germany (postcode 15324).
Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).