Planning pack for this site, £295Other options

Solar · United Kingdom

South Farm, Shingay Cum Wendy - Ground Mounted Solar Array

Operator BeBa Energy UK Limited · Owner Low Energy Systems Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 18 June 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

South Farm, Shingay Cum Wendy - Ground Mounted Solar Array is a 0.2 MW solar farm 7.3 km north-west of Royston, Hertfordshire, United Kingdom. Its planning application (24/03999/FUL) went to South Cambridgeshire on 25 October 2024 and was granted on 6 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

BEBA ENERGY UK LTD (07092296), active, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for South Farm, Shingay Cum Wendy - Ground Mounted Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium19 kmMinor
EIR-14932026Solar panels catch fire on Bedford warehouse roof23 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough47 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
BeBa Energy UK Limited
Owner
Low Energy Systems Limited
Location
South Farm, New Shingay, Shingay Cum Wendy, Royston, Hertfordshire, SG8 0HR, United Kingdom
Planning authority
South Cambridgeshire
Planning application
24/03999/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/03999/FUL, with what the planning evidence pack adds for this site.

Every application in South Cambridgeshire · Alerts for applications and incidents near here

  • 25 October 2024 Planning application submitted
  • 6 June 2025 Planning permission granted
  • 6 June 2028 Planning permission runs out

None found. The register holds no published incident that names South Farm, Shingay Cum Wendy - Ground Mounted Solar Array. If you know of one, report it (confidential reports are anonymised).

Has South Farm, Shingay Cum Wendy - Ground Mounted Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names South Farm, Shingay Cum Wendy - Ground Mounted Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of South Farm, Shingay Cum Wendy - Ground Mounted Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 June 2025.
Where is South Farm, Shingay Cum Wendy - Ground Mounted Solar Array?
7.3 km north-west of Royston, Hertfordshire, United Kingdom (postcode SG8 0HR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).