Solar · United Kingdom

Solar PV Energy Development in Newry

Operator HHT Management Limited

Awaiting Construction2 MWData checked 16 November 2026Source record dated 19 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Solar PV Energy Development in Newry is a 2 MW solar farm 9.3 km north of Newry, Co. Newry Mourne & Down, United Kingdom. Its planning application (LA07/2024/0589/F) went to Newry, Mourne and Down on 16 April 2024 and was granted on 14 May 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Solar PV Energy Development in Newry sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0752, Storm Darragh damages newly commissioned Anglesey solar farm panels, 170 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07522024Storm Darragh damages newly commissioned Anglesey solar farm panels170 kmSignificant
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey173 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School261 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
HHT Management Limited
Location
Lands Approximately 315m North of 7 Glen Road, Co. Newry Mourne & Down, BT34 1SX, United Kingdom
Planning authority
Newry, Mourne and Down
Planning application
LA07/2024/0589/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA07/2024/0589/F, with what the planning evidence pack adds for this site.

Every application in Newry, Mourne and Down · Alerts for applications and incidents near here

  • 16 April 2024 Planning application submitted
  • 14 May 2026 Planning permission granted
  • 15 April 2031 Planning permission runs out

None found. The register holds no published incident that names Solar PV Energy Development in Newry. If you know of one, report it (confidential reports are anonymised).

Has Solar PV Energy Development in Newry had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Solar PV Energy Development in Newry; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Solar PV Energy Development in Newry?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2026.
Where is Solar PV Energy Development in Newry?
9.3 km north of Newry, Co. Newry Mourne & Down, United Kingdom (postcode BT34 1SX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).