Solar Farm on land east of the A38, Willington

Operator Lark Energy · Owner Kingfisher Ventures Limited

Abandoned3.8 MWData checked 16 November 2026Source record dated 17 September 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Solar Farm on land east of the A38, Willington is a 3.8 MW solar farm 6.6 km south-west of Sinfin, Derbyshire, United Kingdom. Its planning application (9/2015/0986) went to South Derbyshire on 19 October 2015 and was granted on 10 February 2016. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 45 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 32 other sites and 611 energy sites within 40 km for Solar Farm on land east of the A38, Willington

Members see the sites and incidents around this one, and every record behind them.

LARK ENERGY LIMITED (10760734), dissolved, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Lark Energy
Owner
Kingfisher Ventures Limited
Location
Land AT SK2828 6687, Burton Road, Egginton, Derby, Derbyshire, East Midlands, Derbyshire, DE65 6, United Kingdom
Planning authority
South Derbyshire
Planning application
9/2015/0986

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 9/2015/0986, with what the planning evidence pack adds for this site.

Every application in South Derbyshire · Alerts for applications and incidents near here

  • 19 October 2015 Planning application submitted
  • 10 February 2016 Planning permission granted
  • 10 February 2019 Planning permission expired

None found. The register holds no published incident that names Solar Farm on land east of the A38, Willington. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Solar Farm on land east of the A38, Willington had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Solar Farm on land east of the A38, Willington; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Solar Farm on land east of the A38, Willington?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 17 September 2018.
Where is Solar Farm on land east of the A38, Willington?
6.6 km south-west of Sinfin, Derbyshire, United Kingdom (postcode DE65 6).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).