Solar Farm Development in Antrim

Operator Elgin Energy Esco Limited

Application Submitted20 MWData checked 16 November 2026Source record dated 1 November 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Solar Farm Development in Antrim is a 20 MW solar farm Co. Antrim, United Kingdom. Its planning application (LA03/2024/0661/S54) went to Antrim and Newtownabbey on 4 September 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Solar Farm Development in Antrim sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, newest first. This site has no map point in the dataset, so the pack lists them newest first.

ReferenceYearIncidentFrom the siteSeverity
EIR-29232026Small inverter fire at solar installation near Market Draytonnot mappedMinor
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalownot mappedMajor
EIR-14862026Fire under solar panels at Broadclyst brought under controlnot mappedSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Elgin Energy Esco Limited
Location
Steeple Road, Co. Antrim, BT41 3SF, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
LA03/2024/0661/S54

The planning application page for LA03/2024/0661/S54, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey ·

  • 4 September 2024 Planning application submitted

None found. The register holds no published incident that names Solar Farm Development in Antrim. If you know of one, report it (confidential reports are anonymised).

Has Solar Farm Development in Antrim had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Solar Farm Development in Antrim; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Solar Farm Development in Antrim?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 1 November 2024.
Where is Solar Farm Development in Antrim?
Co. Antrim, United Kingdom (postcode BT41 3SF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.