← Back to Humberside

Onshore wind · United Kingdom

Sober Hill Wind Farm

Operator West Coast Energy

Operational15 MWData checked 16 November 2026Source record dated 20 August 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sober Hill Wind Farm is a 15 MW wind farm 5.5 km south-east of Market Weighton, Humberside, United Kingdom. Its planning application (08/04816/STPLFE) went to East Riding of Yorkshire on 3 October 2008 and was granted on appeal on 19 March 2010. It has been operating since 1 September 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 18 other sites and 443 energy sites within 40 km for Sober Hill Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
15 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
West Coast Energy
Location
Land North Of Sober Hill Farm Stoneknowle Hill North Newbald, Humberside, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
08/04816/STPLFE
First operating
2013
Turbines
6

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 08/04816/STPLFE, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 3 October 2008 Planning application submitted
  • 3 April 2009 Planning permission refused
  • 19 March 2010 Planning permission granted
  • 19 March 2010 Appeal granted
  • 1 March 2012 Construction started
  • 1 September 2013 Operational

None found. The register holds no published incident that names Sober Hill Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sober Hill Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sober Hill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Sober Hill Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 August 2014.
Where is Sober Hill Wind Farm?
5.5 km south-east of Market Weighton, Humberside, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).