Onshore wind · United Kingdom
Sober Hill Wind Farm
Operator West Coast Energy
Revised1.5 MWData checked 16 November 2026Source record dated 19 December 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Sober Hill Wind Farm is a 1.5 MW wind farm 5.5 km south-east of Market Weighton, Humberside, United Kingdom. Its planning application went to East Riding of Yorkshire on 1 September 1995 and was refused on 14 December 1995. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 13 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Sober Hill Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sober Hill Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1946, Wind turbine fire sends black smoke across Hull, 19 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1946 | 2022 | Wind turbine fire sends black smoke across Hull | 19 km | Significant |
| EIR-1810 | 2022 | Wind turbine at Cargill Hull factory damaged by fire | 19 km | Major |
| EIR-0923 | 2009 | Wind turbine blade detaches at Conisholme wind farm in Lincolnshire after bolt failure | 64 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- West Coast Energy
- Location
- Sober Hill Wind Farm North Newbald, Humberside, United Kingdom
- Planning authority
- East Riding of Yorkshire
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in East Riding of Yorkshire · Alerts for applications and incidents near here
Timeline
- 1 September 1995 Planning application submitted
- 14 December 1995 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Sober Hill Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Sober Hill Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Sober Hill Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Sober Hill Wind Farm?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 19 December 2013.
- Where is Sober Hill Wind Farm?
- 5.5 km south-east of Market Weighton, Humberside, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).