Solar · United Kingdom

Silveroaks Farm, Hawkhurst Lane - Solar Panels

Operator Kenton Williams

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 1 April 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Silveroaks Farm, Hawkhurst Lane - Solar Panels is a 0.2 MW solar farm 6.8 km east of Uckfield, East Sussex, United Kingdom. Its planning application (WD/2025/0095/F) went to Wealden on 15 January 2025 and was granted on 11 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 21 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Silveroaks Farm, Hawkhurst Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13032017Solar panel inverter fault destroys two Lewes homes16 kmSignificant
EIR-15272023Fire affects solar panels on nursing home roof in Woodingdean23 kmMinor
EIR-15222026Fire damages roof with one solar panel in The Charltons23 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Kenton Williams
Location
Silveroaks Farm, Hawkhurst Lane, Waldron, Heathfield, East Sussex, TN21 0RS, United Kingdom
Planning authority
Wealden
Planning application
WD/2025/0095/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/2025/0095/F, with what the planning evidence pack adds for this site.

Every application in Wealden · Alerts for applications and incidents near here

  • 15 January 2025 Planning application submitted
  • 11 March 2025 Planning permission granted
  • 11 March 2028 Planning permission runs out

None found. The register holds no published incident that names Silveroaks Farm, Hawkhurst Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Silveroaks Farm, Hawkhurst Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Silveroaks Farm, Hawkhurst Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Silveroaks Farm, Hawkhurst Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2025.
Where is Silveroaks Farm, Hawkhurst Lane - Solar Panels?
6.8 km east of Uckfield, East Sussex, United Kingdom (postcode TN21 0RS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).