← Back to Warwickshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Sherbourne Warwick Solar (Hampton Lodge)

Operator Fuse EPC Limited

Awaiting Construction20 MWData checked 16 November 2026Source record dated 24 August 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sherbourne Warwick Solar (Hampton Lodge) is a 20 MW solar farm 4.2 km south-west of Warwick, United Kingdom. Its planning application (W/22/0548) went to Warwick on 30 May 2022 and was granted on appeal on 25 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 37 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sherbourne Warwick Solar (Hampton Lodge) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college29 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home41 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property53 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Fuse EPC Limited
Location
W/O A46 Sherbourne., Warwickshire, CV35 8AB, United Kingdom
Planning authority
Warwick
Planning application
W/22/0548
Appeal reference
APP/T3725/W/23/3317247

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/22/0548, with what the planning evidence pack adds for this site.

Every application in Warwick · Alerts for applications and incidents near here

  • 30 May 2022 Planning application submitted
  • 26 August 2022 Planning permission refused
  • 23 February 2023 Appeal lodged
  • 25 September 2023 Planning permission granted
  • 25 September 2023 Appeal granted
  • 25 September 2026 Planning permission expired

None found. The register holds no published incident that names Sherbourne Warwick Solar (Hampton Lodge). If you know of one, report it (confidential reports are anonymised).

Has Sherbourne Warwick Solar (Hampton Lodge) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sherbourne Warwick Solar (Hampton Lodge); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sherbourne Warwick Solar (Hampton Lodge)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 August 2026.
Where is Sherbourne Warwick Solar (Hampton Lodge)?
4.2 km south-west of Warwick, United Kingdom (postcode CV35 8AB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).