← Back to Warwickshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Sherbourne - Solar Farm

Operator Namene Solar

Revised25 MWData checked 16 November 2026Source record dated 11 November 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sherbourne - Solar Farm is a 25 MW solar farm 4.5 km south-west of Warwick, United Kingdom. Its planning application (W/22/0997) went to Warwick on 10 June 2022 and was withdrawn on 8 September 2022. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 33 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

NAMENE SOLAR LIGHTS LIMITED (11318851), active, since 2018. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Sherbourne - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college29 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home41 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property53 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
25 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Namene Solar
Location
W/O The A46, Sherbourne, Warwick, Warwickshire, CV35 8AG, United Kingdom
Planning authority
Warwick
Planning application
W/22/0997

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/22/0997, with what the planning evidence pack adds for this site.

Every application in Warwick · Alerts for applications and incidents near here

  • 10 June 2022 Planning application submitted
  • 8 September 2022 Application withdrawn

None found. The register holds no published incident that names Sherbourne - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Sherbourne - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sherbourne - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sherbourne - Solar Farm?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 11 November 2021.
Where is Sherbourne - Solar Farm?
4.5 km south-west of Warwick, United Kingdom (postcode CV35 8AG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).