Solar · United Kingdom

Sharland Solar Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational2.8 MWData checked 16 November 2026Source record dated 26 May 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sharland Solar Farm is a 2.8 MW solar farm 10 km north-west of Crediton, Devon, United Kingdom. Its planning application (15/00537/MFUL) went to Mid Devon on 31 March 2015 and was granted on 8 July 2015. It has been operating since 4 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 6 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 243 energy sites within 40 km for Sharland Solar Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
2.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land at (Sharland Farm), Morchard Bishop, Crediton, Devon, Devon, EX17 6SJ, United Kingdom
Planning authority
Mid Devon
Planning application
15/00537/MFUL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00537/MFUL, with what the planning evidence pack adds for this site.

Every application in Mid Devon · Alerts for applications and incidents near here

  • 31 March 2015 Planning application submitted
  • 8 July 2015 Planning permission granted
  • 19 December 2016 Construction started
  • 4 March 2017 Operational

None found. The register holds no published incident that names Sharland Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sharland Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sharland Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sharland Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 May 2017.
Where is Sharland Solar Farm?
10 km north-west of Crediton, Devon, United Kingdom (postcode EX17 6SJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).