Around this site

← Back to Shandong

Solar · China

Shandong Province Jining Weishan Huanchengzhen Huaneng " Front Runner" solar farm

Operational100 MWChecked 8 October 2026Last changed in the dataset 20 August 2024

Technology
Solar
Capacity
100 MW
Status
Operational (Operating)
Operator
Huaneng Weishan New Energy
Owner
Huaneng Shandong Ruyi Coal and Electricity Co Ltd [100%]
Location
Huancheng Town, Jining, Shandong, China
First operating
2018

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Shandong Province Jining Weishan Huanchengzhen Huaneng " Front Runner" solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.