Solar · United Kingdom
Sewage Works, Southampton Road - Solar Farm
Operator Communities for Renewables CIC
Application Withdrawn2 MWData checked 16 November 2026Source record dated 22 July 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Sewage Works, Southampton Road - Solar Farm is a 2 MW solar farm on the edge of Salisbury, Wiltshire, United Kingdom. Its planning application (PL/2023/06905) went to Wiltshire on 23 August 2023 and was withdrawn on 18 July 2024. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 21 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Sewage Works, Southampton Road - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Communities for Renewables CIC
- Location
- Adj Sewage Works, Petersfinger Farm, Southampton Road, Salisbury, Wiltshire, SP5 3EU, United Kingdom
- Planning authority
- Wiltshire
- Planning application
- PL/2023/06905
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PL/2023/06905, with what the planning evidence pack adds for this site.
Every application in Wiltshire · Alerts for applications and incidents near here
Timeline
- 23 August 2023 Planning application submitted
- 18 July 2024 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Sewage Works, Southampton Road - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Sewage Works, Southampton Road - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Sewage Works, Southampton Road - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Sewage Works, Southampton Road - Solar Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 22 July 2024.
- Where is Sewage Works, Southampton Road - Solar Farm?
- On the edge of Salisbury, Wiltshire, United Kingdom (postcode SP5 3EU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).