Solar · Spain

San Pedro solar farm (Spain)

Planned (permitted)87 MWChecked 8 October 2026Last changed in the dataset 13 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for San Pedro solar farm (Spain) sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
87 MW
Status
Planned (permitted) (Pre-construction)
Operator
Progresión Dinámica
Owner
Viridi RE [100%]
Location
Palomeque, Toledo, Castilla-La Mancha, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names San Pedro solar farm (Spain). If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.