Battery storage · United Kingdom

Salcey Solar Farm

Operator Anesco · Owner Quanesco Midco Limited

Operational1 MWData checked 16 November 2026Source record dated 21 March 2019

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Salcey Solar Farm is a 1 MW battery storage site 7.3 km west of Olney, Buckinghamshire, United Kingdom. Its planning application (16/00631/FUL) went to Milton Keynes on 17 March 2016. It has been operating since 1 December 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 48 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 63 other sites and 619 energy sites within 40 km for Salcey Solar Farm

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Bulls Head Farm, Eakley Lanes, Newport Pagnell, Buckinghamshire, MK16 8LP, United Kingdom
Planning authority
Milton Keynes
Planning application
16/00631/FUL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 16/00631/FUL, with what the planning evidence pack adds for this site.

Every application in Milton Keynes · Alerts for applications and incidents near here

  • 17 March 2016 Planning application submitted
  • 1 December 2017 Operational

None found. The register holds no published incident that names Salcey Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Salcey Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Salcey Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Salcey Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 21 March 2019.
Where is Salcey Solar Farm?
7.3 km west of Olney, Buckinghamshire, United Kingdom (postcode MK16 8LP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).