Onshore wind · United Kingdom

Royal Oak

Operator EDF Energy Renewables

Abandoned6.5 MWData checked 16 November 2026Source record dated 14 September 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Royal Oak is a 6.5 MW wind farm on the edge of Shildon, County Durham, United Kingdom. Its planning application (05/00183/FULE) went to Darlington on 22 February 2005 and was granted on 10 January 2014. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 21 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 59 other sites and 413 energy sites within 40 km for Royal Oak

Members see the sites and incidents around this one, and every record behind them.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
6.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
EDF Energy Renewables
Location
Royal Oak Farm, Heighington, Darlington, County Durham, United Kingdom
Planning authority
Darlington
Planning application
05/00183/FULE
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 05/00183/FULE, with what the planning evidence pack adds for this site.

Every application in Darlington · Alerts for applications and incidents near here

  • 22 February 2005 Planning application submitted
  • 10 January 2014 Planning permission granted
  • 10 October 2019 Planning permission expired

None found. The register holds no published incident that names Royal Oak. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Royal Oak had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Royal Oak; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Royal Oak?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2016.
Where is Royal Oak?
On the edge of Shildon, County Durham, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).