Roundabout Where Stone Road, Meets Longton Road - Micro Energy Storage

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Application Refused0.2 MWData checked 16 November 2026Source record dated 3 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Roundabout Where Stone Road, Meets Longton Road - Micro Energy Storage is a 0.2 MW battery storage site 4.3 km south of Stoke-on-Trent, Staffordshire, United Kingdom. Its planning application (26/FUL/00459) went to Stoke-on-Trent on 23 April 2026 and was refused on 25 August 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 44 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 382 other sites and 351 energy sites within 40 km for Roundabout Where Stone Road, Meets Longton Road - Micro…

Members see the sites and incidents around this one, and every record behind them.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Roundabout Where Stone Road Meets Longton Road, Staffordshire, ST4 8LQ, United Kingdom
Planning authority
Stoke-on-Trent
Planning application
26/FUL/00459

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/FUL/00459, with what the planning evidence pack adds for this site.

Every application in Stoke-on-Trent · Alerts for applications and incidents near here

  • 23 April 2026 Planning application submitted
  • 25 August 2026 Planning permission refused

None found. The register holds no published incident that names Roundabout Where Stone Road, Meets Longton Road - Micro Energy Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Roundabout Where Stone Road, Meets Longton Road - Micro Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Roundabout Where Stone Road, Meets Longton Road - Micro Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Roundabout Where Stone Road, Meets Longton Road - Micro Energy Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2026.
Where is Roundabout Where Stone Road, Meets Longton Road - Micro Energy Storage?
4.3 km south of Stoke-on-Trent, Staffordshire, United Kingdom (postcode ST4 8LQ).