Battery storage · United Kingdom
Land On The East Side of Meaford Road Battery Storage (Barlaston)
Operator PULSE CLEAN ENERGY SPV RUBIN LIMITED · Owner Pulse Clean Energy SPV Rubin Limited
Awaiting Construction36 MWData checked 16 November 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Land On The East Side of Meaford Road Battery Storage (Barlaston) is a 36 MW battery storage site 3.1 km north of Stone, United Kingdom. Its status in the public dataset is awaiting construction. There are 24 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Land On The East Side of Meaford Road Battery Storage (Barlaston) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PULSE CLEAN ENERGY SPV RUBIN LIMITED (13169020), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land On The East Side of Meaford Road Battery Storage (Barlaston) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 71 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 71 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 73 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 136 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Battery)
- Capacity
- 36 MW (this record)
- Planning record
- 40 MW
- Capacity figure from
- Capacity Market register (EMR Delivery Body)
- Status
- Awaiting Construction (Capacity Market unit, delivery year 2027)
- Operator
- PULSE CLEAN ENERGY SPV RUBIN LIMITED
- Owner
- Pulse Clean Energy SPV Rubin Limited
- Location
- ST15 0UU, United Kingdom
This record is a Capacity Market unit, and 36 MW is the figure entered in the auction. The planning record for this place, Meaford (Barlaston - Battery Energy Storage System), gives 40 MW. Meaford (Barlaston - Battery Energy Storage System)
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Land On The East Side of Meaford Road Battery Storage (Barlaston). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Land On The East Side of Meaford Road Battery Storage (Barlaston) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land On The East Side of Meaford Road Battery Storage (Barlaston); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land On The East Side of Meaford Road Battery Storage (Barlaston)?
- Awaiting Construction, in the public dataset.
- Where is Land On The East Side of Meaford Road Battery Storage (Barlaston)?
- 3.1 km north of Stone, United Kingdom (postcode ST15 0UU).
The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).