← Back to Somerset

Solar · United Kingdom

RITHERDENS FARM solar park

Operator MS POWER PROJECTS LIMITED

Application Refused9.5 MWData checked 16 November 2026Source record dated 23 September 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

RITHERDENS FARM solar park is a 9.5 MW solar farm 3.7 km west of Taunton, Somerset, United Kingdom. Its planning application (07/13/0016) went to Somerset on 9 May 2013 and was refused on 22 August 2013. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 34 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

303 energy sites within 40 km for RITHERDENS FARM solar park

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
9.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
MS POWER PROJECTS LIMITED
Location
LAND NORTH-WEST OF RITHERDENS FARM, BRADFORD ON TONE, Somerset, United Kingdom
Planning authority
Somerset
Planning application
07/13/0016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 07/13/0016, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 9 May 2013 Planning application submitted
  • 22 August 2013 Planning permission refused

None found. The register holds no published incident that names RITHERDENS FARM solar park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has RITHERDENS FARM solar park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names RITHERDENS FARM solar park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of RITHERDENS FARM solar park?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2013.
Where is RITHERDENS FARM solar park?
3.7 km west of Taunton, Somerset, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).