Solar · United Kingdom

Rhyd-y-Pandy Solar Farm

Operator Wessex Solar Energy

Operational6 MWData checked 16 November 2026Source record dated 29 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rhyd-y-Pandy Solar Farm is a 6 MW solar farm 3.1 km north-west of Clydach, West Glamorgan, United Kingdom. Its planning application (2013/1639) went to Swansea on 15 November 2013 and was granted on 20 February 2014. It has been operating since 6 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 53 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 25 other sites and 242 energy sites within 40 km for Rhyd-y-Pandy Solar Farm

Members see the sites and incidents around this one, and every record behind them.

WESSEX SOLAR ENERGY LIMITED (12226450), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wessex Solar Energy
Location
Cefn Betingau Farm, Rhydypandy Road, Morriston, Swansea, West Glamorgan, SA6 6NX, United Kingdom
Planning authority
Swansea
Planning application
2013/1639
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2013/1639, with what the planning evidence pack adds for this site.

Every application in Swansea · Alerts for applications and incidents near here

  • 15 November 2013 Planning application submitted
  • 20 February 2014 Planning permission granted
  • 1 November 2014 Construction started
  • 6 March 2015 Operational

None found. The register holds no published incident that names Rhyd-y-Pandy Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Rhyd-y-Pandy Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rhyd-y-Pandy Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rhyd-y-Pandy Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 May 2015.
Where is Rhyd-y-Pandy Solar Farm?
3.1 km north-west of Clydach, West Glamorgan, United Kingdom (postcode SA6 6NX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).