Felindre Pumping Station Substation Battery Storage (Swansea Greener Grid Park) is a 12 MW battery storage site 3.6 km west of Clydach, West Glamorgan, United Kingdom. Its planning application (2021/0163/FUL) went to Swansea on 21 January 2021 and was granted on 9 August 2021. Construction started on 1 December 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 54 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

STATKRAFT UK LTD (05742795), active, since 2006. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Felindre Pumping Station Substation Battery Storage (Swansea Greener Grid Park) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 111 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter111 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire139 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool202 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Statkraft UK & Swansea Grid Solutions
Owner
Statkraft UK Ltd
Location
Land West Of, Rhydypandy Road, Morriston, Swansea, West Glamorgan, SA6 6NU, United Kingdom
Planning authority
Swansea
Planning application
2021/0163/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2021/0163/FUL, with what the planning evidence pack adds for this site.

Every application in Swansea · Alerts for applications and incidents near here

  • 21 January 2021 Planning application submitted
  • 9 August 2021 Planning permission granted
  • 1 December 2024 Construction started

None found. The register holds no published incident that names Felindre Pumping Station Substation Battery Storage (Swansea Greener Grid Park). If you know of one, report it (confidential reports are anonymised).

Has Felindre Pumping Station Substation Battery Storage (Swansea Greener Grid Park) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Felindre Pumping Station Substation Battery Storage (Swansea Greener Grid Park); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Felindre Pumping Station Substation Battery Storage (Swansea Greener Grid Park)?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2025.
Where is Felindre Pumping Station Substation Battery Storage (Swansea Greener Grid Park)?
3.6 km west of Clydach, West Glamorgan, United Kingdom (postcode SA6 6NU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).