Onshore wind · United Kingdom
Rheidol Wind Farm
Operator Powergen
Operational2.4 MWData checked 16 November 2026Source record dated 8 December 2003
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Rheidol Wind Farm is a 2.4 MW wind farm 14 km east of Aberystwyth, Dyfed, United Kingdom. Its planning application went to Ceredigion on 1 August 1991 and was granted on 6 August 1996. It has been operating since 6 February 1997. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Rheidol Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 2.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Powergen
- Location
- Rheidol Wind Farm, Banc Bwa Drain, Goginan, Aberystwyth, Dyfed, SW23 3PQ, United Kingdom
- Planning authority
- Ceredigion
- First operating
- 1997
- Turbines
- 8
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Ceredigion · Alerts for applications and incidents near here
Timeline
- 1 August 1991 Planning application submitted
- 6 August 1996 Planning permission granted
- 6 February 1997 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Rheidol Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Rheidol Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Rheidol Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Rheidol Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 December 2003.
- Where is Rheidol Wind Farm?
- 14 km east of Aberystwyth, Dyfed, United Kingdom (postcode SW23 3PQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).