Onshore wind · United Kingdom

Mynydd Gorddu Wind Farm

Operator Cynllun Trydan Gwynt

Operational10.2 MWData checked 16 November 2026Source record dated 18 May 2006

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mynydd Gorddu Wind Farm is a 10.2 MW wind farm 9.5 km north-east of Aberystwyth, Dyfed, United Kingdom. Its planning application went to Ceredigion on 4 January 1991 and was granted on 12 September 1991. It has been operating since 18 April 1998. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 5 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

57 energy sites within 40 km for Mynydd Gorddu Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
10.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Cynllun Trydan Gwynt
Location
Mynydd Gorddu Elerch Tal-y-Bont Dyfed, Dyfed, United Kingdom
Planning authority
Ceredigion
First operating
1998
Turbines
19

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Ceredigion · Alerts for applications and incidents near here

  • 4 January 1991 Planning application submitted
  • 12 September 1991 Planning permission granted
  • 18 April 1998 Operational

None found. The register holds no published incident that names Mynydd Gorddu Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mynydd Gorddu Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mynydd Gorddu Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Mynydd Gorddu Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 May 2006.
Where is Mynydd Gorddu Wind Farm?
9.5 km north-east of Aberystwyth, Dyfed, United Kingdom.