Planning pack for this site, £295Other options

Onshore wind · Germany

Repowering WEA

Operator Ökowindpark Hinrichs GmbH

Planned5.6 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Repowering WEA is a 5.6 MW wind farm 5.4 km south of Sögel, Groß Berßen, Emsland, Niedersachsen, Germany. It first operated in 2028. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 20 other energy sites within 10 km. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Repowering WEA sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-0808, Nacelle fire at Rhede wind farm prompts Enercon investigation, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08082018Nacelle fire at Rhede wind farm prompts Enercon investigation33 kmSignificant
EIR-13522023Turbine fire at Stemwede Bürgerwindpark in Germany77 kmSignificant
EIR-07402025Nordex turbine collapses at Herkentrup wind farm in Germany97 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
5.6 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Ökowindpark Hinrichs GmbH
Location
Groß Berßen, Emsland, Niedersachsen, 49777, Germany
First operating
2028

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Repowering WEA. If you know of one, report it (confidential reports are anonymised).

Has Repowering WEA had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Repowering WEA; it holds 30 incidents at wind farms in Germany.
What is the status of Repowering WEA?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Repowering WEA?
5.4 km south of Sögel, Groß Berßen, Emsland, Niedersachsen, Germany (postcode 49777).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).