← Back to Devon

Solar · United Kingdom

Red Hill Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational4.8 MWData checked 16 November 2026Source record dated 22 February 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Red Hill Farm is a 4.8 MW solar farm 13 km north-east of Cullompton, Devon, United Kingdom. Its planning application (14/01984/MFUL) went to Mid Devon on 25 November 2014 and was granted on 13 February 2015. It has been operating since 9 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 290 energy sites within 40 km for Red Hill Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land At Redhill Farm, Burlescombe, Tiverton, Devon, EX16 7JT, United Kingdom
Planning authority
Mid Devon
Planning application
14/01984/MFUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01984/MFUL, with what the planning evidence pack adds for this site.

Every application in Mid Devon · Alerts for applications and incidents near here

  • 25 November 2014 Planning application submitted
  • 13 February 2015 Planning permission granted
  • 22 September 2015 Construction started
  • 9 December 2015 Operational

None found. The register holds no published incident that names Red Hill Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Red Hill Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Red Hill Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Red Hill Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 February 2016.
Where is Red Hill Farm?
13 km north-east of Cullompton, Devon, United Kingdom (postcode EX16 7JT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).