Solar · United Kingdom
Rampisham Down Transmitting Station
Operator Higher Hill Farm Partnership
Application Withdrawn24 MWData checked 16 November 2026Source record dated 18 July 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Rampisham Down Transmitting Station is a 24 MW solar farm 12 km north-east of Bridport, Dorset, United Kingdom. Its planning application (1/D/12/001664) went to Dorset on 3 December 2012 and was withdrawn on 20 February 2017. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 15 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Rampisham Down Transmitting Station changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 24 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Higher Hill Farm Partnership
- Location
- Rampisham, Dorchester, Dorset, Dorset, DT2 0HS, United Kingdom
- Planning authority
- Dorset
- Planning application
- 1/D/12/001664
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 1/D/12/001664, with what the planning evidence pack adds for this site.
Every application in Dorset · Alerts for applications and incidents near here
Timeline
- 3 December 2012 Planning application submitted
- 20 February 2017 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Rampisham Down Transmitting Station. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Rampisham Down Transmitting Station had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Rampisham Down Transmitting Station; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Rampisham Down Transmitting Station?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 18 July 2017.
- Where is Rampisham Down Transmitting Station?
- 12 km north-east of Bridport, Dorset, United Kingdom (postcode DT2 0HS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).