Rampisham Down Transmitting Station

Operator Higher Hill Farm Partnership

Application Withdrawn24 MWData checked 16 November 2026Source record dated 18 July 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Rampisham Down Transmitting Station is a 24 MW solar farm 12 km north-east of Bridport, Dorset, United Kingdom. Its planning application (1/D/12/001664) went to Dorset on 3 December 2012 and was withdrawn on 20 February 2017. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 15 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

256 energy sites within 40 km for Rampisham Down Transmitting Station

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
24 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Higher Hill Farm Partnership
Location
Rampisham, Dorchester, Dorset, Dorset, DT2 0HS, United Kingdom
Planning authority
Dorset
Planning application
1/D/12/001664

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 1/D/12/001664, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 3 December 2012 Planning application submitted
  • 20 February 2017 Application withdrawn

None found. The register holds no published incident that names Rampisham Down Transmitting Station. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Rampisham Down Transmitting Station had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rampisham Down Transmitting Station; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rampisham Down Transmitting Station?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 18 July 2017.
Where is Rampisham Down Transmitting Station?
12 km north-east of Bridport, Dorset, United Kingdom (postcode DT2 0HS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).