Around this site

← Back to Qinghai

Solar · China

Qinghai - Henan High Voltage Transmission (Three Gorges) Gonghe solar power plant

Operational900 MWChecked 8 October 2026Last changed in the dataset 11 January 2024

Technology
Solar
Capacity
900 MW
Status
Operational (Operating)
Operator
Three Gorges New Energy Gonghe Qihang Power Generation
Owner
China Three Gorges Renewables (Group) Co Ltd [90%]; Shouhang High-tech Energy Co Ltd [10%]
Location
Santala (Talatan) Solar Power Generation Park, Hainan AP, Qinghai, China
First operating
2023

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Qinghai - Henan High Voltage Transmission (Three Gorges) Gonghe solar power plant. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.