Planning pack for this site, £295Other options

Battery storage · Germany

PV Epe Batt

Operator Epe-PV GmbH & Co.KG

Planned5 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

PV Epe Batt is a 5 MW battery storage site 4.1 km south of Gronau, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 52 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 17 incidents at battery storage sites (hybrid battery and solar sites included) in Germany, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for PV Epe Batt sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-1586, Third battery fire at Suncycle site in Thuringia, 310 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15862024Third battery fire at Suncycle site in Thuringia310 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre310 kmSignificant
EIR-00972026Battery storage fire in Bautzen, Germany prompts local evacuations522 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 10 MWh, Lithium-Batterie)
Capacity
5 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Epe-PV GmbH & Co.KG
Location
Gronau (Westf.), Borken, Nordrhein-Westfalen, 48599, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names PV Epe Batt. If you know of one, report it (confidential reports are anonymised).

Has PV Epe Batt had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names PV Epe Batt; it holds 17 incidents at battery storage sites (hybrid battery and solar sites included) in Germany.
What is the status of PV Epe Batt?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is PV Epe Batt?
4.1 km south of Gronau, Germany (postcode 48599).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).