← Back to Brandenburg
Planning pack for this site, £295Other options

Onshore wind · Germany

Pritzwalk-Giesensdorf

Operator Green Wind Energy GmbH

Planned17.1 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pritzwalk-Giesensdorf is a 17.1 MW wind farm 3.6 km north-east of Drachten, Pritzwalk, Prignitz, Brandenburg, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 350 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pritzwalk-Giesensdorf sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-0808, Nacelle fire at Rhede wind farm prompts Enercon investigation, 77 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08082018Nacelle fire at Rhede wind farm prompts Enercon investigation77 kmSignificant
EIR-07402025Nordex turbine collapses at Herkentrup wind farm in Germany150 kmMajor
EIR-25762026Wind turbine collapses onto fields in Weeze, Germany168 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
17.1 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
Green Wind Energy GmbH
Location
Pritzwalk, Prignitz, Brandenburg, 16928, Germany
First operating
2027
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Pritzwalk-Giesensdorf. If you know of one, report it (confidential reports are anonymised).

Has Pritzwalk-Giesensdorf had a fire or other incident?
None is on the register as of 10 November 2026. The register holds no published incident that names Pritzwalk-Giesensdorf; it holds 30 incidents at wind farms in Germany.
What is the status of Pritzwalk-Giesensdorf?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Pritzwalk-Giesensdorf?
3.6 km north-east of Drachten, Pritzwalk, Prignitz, Brandenburg, Germany (postcode 16928).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).