← Back to Borders
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Pressmains, Coldingham - Wind Turbine

Operator J Dalton & Sons

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 30 September 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pressmains, Coldingham - Wind Turbine is a 0.2 MW wind farm 18 km north-west of Berwick-Upon-Tweed, Borders, United Kingdom. Its planning application (25/00650/FUL) went to Scottish Borders on 22 May 2025 and was granted on 12 September 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pressmains, Coldingham - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0441, Wind turbine collapses at Aviva's Pitheavlis site in Perth, 95 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04412025Wind turbine collapses at Aviva's Pitheavlis site in Perth95 kmSignificant
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire100 kmMinor
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow130 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
J Dalton & Sons
Location
Pressmains, Coldingham, Eyemouth, Borders, TD14 5TS, United Kingdom
Planning authority
Scottish Borders
Planning application
25/00650/FUL
Turbines
1, 49.5 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00650/FUL, with what the planning evidence pack adds for this site.

Every application in Scottish Borders · Alerts for applications and incidents near here

  • 22 May 2025 Planning application submitted
  • 12 September 2025 Planning permission granted
  • 12 September 2028 Planning permission runs out

None found. The register holds no published incident that names Pressmains, Coldingham - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Pressmains, Coldingham - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pressmains, Coldingham - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Pressmains, Coldingham - Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2025.
Where is Pressmains, Coldingham - Wind Turbine?
18 km north-west of Berwick-Upon-Tweed, Borders, United Kingdom (postcode TD14 5TS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).