Onshore wind · United Kingdom

Howpark Wind Farm

Operator Eurowind (UK) Limited

Operational16 MWData checked 16 November 2026Source record dated 14 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Howpark Wind Farm is a 16 MW wind farm 18 km south-east of Dunbar, Scottish Borders, United Kingdom. Its planning application (16/00980/FUL) went to Scottish Borders on 23 August 2016 and was granted on appeal on 24 April 2018. It has been operating since 1 January 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 22 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 118 energy sites within 40 km for Howpark Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
16 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Eurowind (UK) Limited
Location
Land North of Howpark Farm, Grantshouse, Duns, Scottish Borders, TD11 3RP, United Kingdom
Planning authority
Scottish Borders
Planning application
16/00980/FUL
Appeal reference
PPA-140-2060
First operating
2024
Turbines
8, 100 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 16/00980/FUL, with what the planning evidence pack adds for this site.

Every application in Scottish Borders · Alerts for applications and incidents near here

  • 23 August 2016 Planning application submitted
  • 24 April 2017 Planning permission refused
  • 19 July 2017 Appeal lodged
  • 24 April 2018 Planning permission granted
  • 24 April 2018 Appeal granted
  • 28 March 2021 Construction started
  • 1 January 2024 Operational

None found. The register holds no published incident that names Howpark Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Howpark Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Howpark Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Howpark Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 May 2026.
Where is Howpark Wind Farm?
18 km south-east of Dunbar, Scottish Borders, United Kingdom (postcode TD11 3RP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).