Around this site

← Back to Minas Gerais

Solar · Brazil

Presidente JK solar farm

Cancelled360 MWChecked 8 October 2026Last changed in the dataset 4 November 2024

Technology
Solar
Capacity
360 MW
Status
Cancelled
Location
Região Geográfica Intermediária de Belo Horizonte, Minas Gerais, Brazil
Phases in the tracker
12

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Presidente JK solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.