Around this site

← Back to Minas Gerais

Solar · Brazil

Presidente Juscelino PV Solar Plant

Planned (permitted)481 MWChecked 8 October 2026Last changed in the dataset 11 June 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Presidente Juscelino PV Solar Plant sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
481 MW
Status
Planned (permitted) (Pre-construction)
Operator
Voltalia Energia do Brasil
Owner
Voltalia SA [100%]
Location
Presidente Juscelino, Região Geográfica Intermediária de Belo Horizonte, Minas Gerais, Brazil
Phases in the tracker
10

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Presidente Juscelino PV Solar Plant. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.