Pollnalaght (Cornavarrow) is a 38.4 MW wind farm 6.2 km north of Dromore, Co. Tyrone, United Kingdom. Its planning application (K/2006/1368/F) went to Fermanagh and Omagh on 23 June 2006 and was granted on appeal on 16 October 2009. It has been operating since 15 June 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 17 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 2 other sites and 179 energy sites within 40 km for Pollnalaght (Cornavarrow)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
38.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Energia
Location
Pollnalaght, Drumquin, Co Tyrone, Co. Tyrone, United Kingdom
Planning authority
Fermanagh and Omagh
Planning application
K/2006/1368/F
Appeal reference
A2009/0268
First operating
2018
Turbines
12

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for K/2006/1368/F, with what the planning evidence pack adds for this site.

Every application in Fermanagh and Omagh · Alerts for applications and incidents near here

  • 23 June 2006 Planning application submitted
  • 13 October 2009 Planning permission refused
  • 16 October 2009 Planning permission granted
  • 16 October 2009 Appeal granted
  • 15 December 2015 Construction started
  • 15 June 2018 Operational

None found. The register holds no published incident that names Pollnalaght (Cornavarrow). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pollnalaght (Cornavarrow) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pollnalaght (Cornavarrow); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Pollnalaght (Cornavarrow)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 November 2018.
Where is Pollnalaght (Cornavarrow)?
6.2 km north of Dromore, Co. Tyrone, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).