← Back to Lincolnshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Pilgrims Pride - Solar Array

Operator EDF Energy Renewables

Awaiting Construction1.6 MWData checked 16 November 2026Source record dated 28 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pilgrims Pride - Solar Array is a 1.6 MW solar farm on the edge of Spalding, Lincolnshire, United Kingdom. Its planning application (H16-0871-24) went to South Holland on 24 October 2024 and was granted on 8 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 24 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Pilgrims Pride - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0764, Transformer smoking at solar farm in Burton Pedwardine, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine24 kmMinor
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof26 kmSignificant
EIR-12652024Solar panels catch fire and destroy three buildings in Harby52 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Energy Renewables
Location
Pilgrims Pride Limited, Fulney Lane North, Spalding, Lincolnshire, PE12 6EP, United Kingdom
Planning authority
South Holland
Planning application
H16-0871-24

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for H16-0871-24, with what the planning evidence pack adds for this site.

Every application in South Holland · Alerts for applications and incidents near here

  • 24 October 2024 Planning application submitted
  • 8 July 2025 Planning permission granted
  • 8 July 2028 Planning permission runs out

None found. The register holds no published incident that names Pilgrims Pride - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Pilgrims Pride - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pilgrims Pride - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pilgrims Pride - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2025.
Where is Pilgrims Pride - Solar Array?
On the edge of Spalding, Lincolnshire, United Kingdom (postcode PE12 6EP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).