Onshore wind · United Kingdom

Pentre Tump

Operator REG Windpower

Appeal Refused4.5 MWData checked 16 November 2026Source record dated 27 February 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pentre Tump is a 4.5 MW wind farm 14 km east of Llandrindod Wells, Powys, United Kingdom. Its planning application (P/2012/0779) went to Powys on 13 July 2012 and was refused on appeal on 28 January 2014. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 22 other sites and 62 energy sites within 40 km for Pentre Tump

Members see the sites and incidents around this one, and every record behind them.

REG WINDPOWER LIMITED (02431173), active, since 1989. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
4.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
REG Windpower
Location
Radnor, Presteigne, Powys, United Kingdom
Planning authority
Powys
Planning application
P/2012/0779
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/2012/0779, with what the planning evidence pack adds for this site.

Every application in Powys · Alerts for applications and incidents near here

  • 13 July 2012 Planning application submitted
  • 13 December 2012 Planning permission refused
  • 28 January 2014 Appeal refused

None found. The register holds no published incident that names Pentre Tump. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pentre Tump had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pentre Tump; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Pentre Tump?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 27 February 2014.
Where is Pentre Tump?
14 km east of Llandrindod Wells, Powys, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).