Solar · United Kingdom
Park Lane, Astley - Solar PV Farm
Operator Tor Energy Solar Limited
Under Construction30 MWData checked 16 November 2026Source record dated 4 September 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Park Lane, Astley - Solar PV Farm is a 30 MW solar farm 6.1 km south-west of Hartshill, Warwickshire, United Kingdom. Its planning application (PAP/2021/0651) went to North Warwickshire on 1 December 2021 and was granted on 28 July 2022. Construction started on 1 July 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 41 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Park Lane, Astley - Solar PV Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Park Lane, Astley - Solar PV Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 20 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1272 | 2022 | Fire in solar panel distribution board at Birmingham college | 20 km | Minor |
| EIR-2151 | 2018 | Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge | 38 km | Significant |
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 42 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Tor Energy Solar Limited
- Location
- N/O Park Lane Farm, Park Lane, Astley, Nuneaton, Warwickshire, CV10 7QH, United Kingdom
- Planning authority
- North Warwickshire
- Planning application
- PAP/2021/0651
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PAP/2021/0651, with what the planning evidence pack adds for this site.
Every application in North Warwickshire · Alerts for applications and incidents near here
Status changed from Awaiting Construction to Under Construction on 16 November 2026.
Timeline
- 1 December 2021 Planning application submitted
- 28 July 2022 Planning permission granted
- 1 July 2025 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Park Lane, Astley - Solar PV Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Park Lane, Astley - Solar PV Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Park Lane, Astley - Solar PV Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Park Lane, Astley - Solar PV Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Park Lane, Astley - Solar PV Farm?
- 6.1 km south-west of Hartshill, Warwickshire, United Kingdom (postcode CV10 7QH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).