Park Lane, Astley - Battery Energy Storage

Operator Tor Energy Solar Limited

Under ConstructionData checked 16 November 2026Source record dated 4 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Park Lane, Astley - Battery Energy Storage is a battery storage site 6.1 km south-west of Hartshill, Warwickshire, United Kingdom. Its planning application (PAP/2021/0651) went to North Warwickshire on 1 December 2021 and was granted on 28 July 2022. Construction started on 1 July 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 41 other energy sites within 10 km, 9 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Park Lane, Astley - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 75 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells75 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire91 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool135 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Under Construction
Operator or applicant
Tor Energy Solar Limited
Location
N/O Park Lane Farm, Park Lane, Astley, Nuneaton, Warwickshire, CV10 7QH, United Kingdom
Planning authority
North Warwickshire
Planning application
PAP/2021/0651

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PAP/2021/0651, with what the planning evidence pack adds for this site.

Every application in North Warwickshire · Alerts for applications and incidents near here

Status changed from Awaiting Construction to Under Construction on 16 November 2026.

  • 1 December 2021 Planning application submitted
  • 28 July 2022 Planning permission granted
  • 1 July 2025 Construction started

None found. The register holds no published incident that names Park Lane, Astley - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Park Lane, Astley - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Park Lane, Astley - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Park Lane, Astley - Battery Energy Storage?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Park Lane, Astley - Battery Energy Storage?
6.1 km south-west of Hartshill, Warwickshire, United Kingdom (postcode CV10 7QH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).