← Back to Essex

Solar · United Kingdom

Outwood Farm (Phase 1)

Operator MS Power Projects

Operational5 MWData checked 16 November 2026Source record dated 1 July 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Outwood Farm (Phase 1) is a 5 MW solar farm on the edge of Billericay, Essex, United Kingdom. Its planning application (14/00948/FULL) went to Basildon on 7 August 2014 and was granted on 11 December 2014. It has been operating since 30 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 65 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 667 energy sites within 40 km for Outwood Farm (Phase 1)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
MS Power Projects
Location
Land At Outwood Farm Road Billericay, Essex, Essex, United Kingdom
Planning authority
Basildon
Planning application
14/00948/FULL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00948/FULL, with what the planning evidence pack adds for this site.

Every application in Basildon · Alerts for applications and incidents near here

  • 7 August 2014 Planning application submitted
  • 11 December 2014 Planning permission granted
  • 1 November 2015 Construction started
  • 30 March 2016 Operational

None found. The register holds no published incident that names Outwood Farm (Phase 1). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Outwood Farm (Phase 1) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Outwood Farm (Phase 1); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Outwood Farm (Phase 1)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2016.
Where is Outwood Farm (Phase 1)?
On the edge of Billericay, Essex, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).