← Back to Essex
Planning pack for this site, £295Other options

Solar · United Kingdom

Outwood Farm (Phase 2)

Operator Wirsol

Awaiting Construction7 MWData checked 16 November 2026Source record dated 24 January 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Outwood Farm (Phase 2) is a 7 MW solar farm on the edge of Billericay, Essex, United Kingdom. Its planning application (14/00948/FULL) went to Basildon on 7 August 2014 and was granted on 11 December 2014. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

WIRSOL ENERGY LIMITED (08989005), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Outwood Farm (Phase 2) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 5.3 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15302023Electrical fault causes solar panel fire in Wickford house5.3 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers11 kmMinor
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire30 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Wirsol
Location
Land At Outwood Farm Road Billericay, Essex, Essex, United Kingdom
Planning authority
Basildon
Planning application
14/00948/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00948/FULL, with what the planning evidence pack adds for this site.

Every application in Basildon · Alerts for applications and incidents near here

  • 7 August 2014 Planning application submitted
  • 11 December 2014 Planning permission granted
  • 11 December 2046 Planning permission runs out

None found. The register holds no published incident that names Outwood Farm (Phase 2). If you know of one, report it (confidential reports are anonymised).

Has Outwood Farm (Phase 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Outwood Farm (Phase 2); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Outwood Farm (Phase 2)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 January 2020.
Where is Outwood Farm (Phase 2)?
On the edge of Billericay, Essex, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).